Maintenance and Sandblasting Painting of Conveyor Lines
Project Years
2024
Project Location
LISCO – Misurata / LİBYA
Project Description
Duration of Work 210 Days
Maintenance and sandblasting-painting works will be carried out for 3 belt conveyor lines used for loading and unloading ships in LISCO (Libyan Iron And Steel Company) port and steel construction structures of these lines. Each line is 950 m long with 3 lines parallel to each other. The total work to be done covers 2850 m. Necessary electrical, steel and mechanical equipment will be maintained and replaced. The entire steel structure will be sandblasted and painted to resist corrosion in accordance with the working conditions by the sea. |