Refubrishment and Overhauling of Intake Water System for Power Plant
Project Year
2019
Project Location
Libya
Project Description
Responsibilities of PARTNER TEKNİK, as "Main Contractor" for Intake Water System rehabilitation:
Most of existing equipment shall be replaced with the new ones while the other equipment and parts to be reused will be repaired, maintained and the wear parts will be replaced. 
PARTNER TEKNİK, as "Main Contractor", is responsible for project management, basic and detailed engineering and supply of new equipment and parts for replacing the existing ones, required spare parts as necessary, materials for  piping, civil works, mechanical and electrical equipment, rehabilitation and repair of the process equipment to be reused, performing the dismantling of the existing equipment and parts, repair and/or modifications as required, erection and installation of the new supplied equipment and parts, commissioning and start-up of the new plant.

Project Photos

Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-and-Overhauling-of-Intake-Water-System-for-Power-Plant
CENTER OFFICE

Yenişehir Mah. Özgür Sok. No:17 Partner Plaza 34779 Ataşehir / İstanbul



partnerteknik@partnerteknik.com


T : +90 216 361 42 05 (Pbx)
F : +90 216 372 64 87
FOLLOW US

Do not forget to follow us on Social Media to be informed about the latest developments about us.


QUICK MENU



All Rights Reserved Partner Teknik © 2020
TR
Refubrishment and Overhauling of Intake Water System for Power Plant

Project Years
2019
Project Location
Libya
Project Description
Responsibilities of PARTNER TEKNİK, as "Main Contractor" for Intake Water System rehabilitation:
Most of existing equipment shall be replaced with the new ones while the other equipment and parts to be reused will be repaired, maintained and the wear parts will be replaced. 
PARTNER TEKNİK, as "Main Contractor", is responsible for project management, basic and detailed engineering and supply of new equipment and parts for replacing the existing ones, required spare parts as necessary, materials for  piping, civil works, mechanical and electrical equipment, rehabilitation and repair of the process equipment to be reused, performing the dismantling of the existing equipment and parts, repair and/or modifications as required, erection and installation of the new supplied equipment and parts, commissioning and start-up of the new plant.

Project Photos

Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-And-Overhauling-Of-Intake-Water-System-For-Power-Plant                                                                                  Refubrishment-and-Overhauling-of-Intake-Water-System-for-Power-Plant
CENTER OFFICE
Yenişehir Mah. Özgür Sok. No:17 Partner Plaza 34779 Ataşehir / İstanbul
partnerteknik@partnerteknik.com
T : +90 216 361 42 05 (Pbx)
F : +90 216 372 64 87
FOLLOW ME
Do not forget to follow us on Social Media to be informed about the latest developments about us.




QUICK MENU




All Rights Reserved Partner Teknik © 2020